On May 5th Seagrave and Salt City Fire Equipment hosted the Village of Hamilton Fire Department at the factory for their pre-construction conference on their new Marauder II 1500 gpm 1000- Gallon Pumper. The preconstruction conference occurred on the 5th and 6th of May. During this time we met with the factory representatives and went over every aspect of the specifications to ensure everything was what the FD wanted. also during the two days FD representatives took a in depth tour of the factory to see how the apparatus is built from the first piece of steel till the final product. It has been a pleasure working with the FD and we look forward to the next trip (Final Inspection) to see the final product.
This is the Fire Departments 1st Seagrave